Rt. 45 By-Pass Project

Milburn By-Pass Update (11/29/18)

Millburn By-Pass Update (10/25/18)

Milburn By-Pass Update (10/11/18)

Milburn By-Pass Update (9/24/18)

Construction Update – Work is progressing at the new intersection of Independence Drive and Route 45.  Berger Construction has lowered Village utilities 2’ feet through the intersection to accommodate the new roadway elevation. The aggregate subbase and recycled asphalt base are now going in and later this week Berger’s subcontractor will start forming the intersection. The Rt. 45 pavement will be Portland Cement (PC) Concrete and will be placed next week. After the concrete is poured, the curing process will require pavement saw-cutting in a very short time window. As a result, extended work hours will be needed, and residents may hear the saws working after normal work hours. Outside of the Rt. 45 pavement, Independence Drive pavement will be asphalt and placed after the 7 day curing process is complete for the new PC Concrete.

1  2

U.S. Route 45 (IL 132 to IL 173 and Millburn Bypass) Frequently Asked Questions

Rt. 45 Limits:

  • South: At the Country Place Intersection
  • North: Existing Rt. 45 north of Independence Boulevard

Grass Lake Road/ Millburn Road Limits:

  • East: Existing Rt. 45 at Milburn Road intersection
  • West: Existing Tunnel under Grass Lake Road

Lead Agency: Illinois Department of Transportation (IDOT)

  • The project is composed of a new roadway (US Route 45 Bypass) from Country Place on the south to 1,500 feet north of Independence Boulevard.
  • Relocated US Route 45 will be a four-lane roadway with curb and gutter and barrier median.
  • Grass Lake Road will be widened and re-aligned to tie into Milburn Road at existing US Route 45.
  • New sidewalks and multi-use path will in installed as part of the project.
  • A new signalized intersection will be formed with re-aligned US Route 45 and re-aligned Grass Lake Road.
  • The traffic signals at the intersections of existing US Route 45 with Milburn Road and Grass Lake Road will be removed and replaced with stop signs.

Funding

  • The Lake County Division of Transportation is funding (100% of the ¼ cent sales tax to transportation) this long awaited IDOT project.
  • Village of Lindenhurst is participating in the cost for a portion of the new sidewalks and multi-use paths.

Bid Opening: Bids were received and opened on April 27, 2018. Berger Excavating Contractors, Inc. was awarded the bid at $15,577,444.23.

Construction Update – As of late August 2018 North Shore Gas, Commonwealth Edison, AT&T, and Comcast have substantially completed relocation of their facilities. Berger Construction is now clearing and grading the new roadway, installing new drainage culverts and storm sewers. Most of the construction is outside of existing roadways with minimal impacts to the motoring public.

Estimated Completion Date: July 2019