A view of Lindenhurst

Hawthorne Drive/ Sprucewood Lane/Lake Shore Drive Improvement Project Comment Form

Contact Us

2301 East Sand Lake Road
Lindenhurst, IL 60046
Get Directions

  • Phone: (847) 356-8252
  • Staff Directory
 Step 1 of 1

The Village has initiated a Phase I Engineering Study to investigate proposed roadway improvements along Hawthorne Drive (from IL Route 132 to Sprucewood Lane), Sprucewood Lane (from Hawthorne Drive to Lake Shore Drive), and Lake Shore Drive (from Sprucewood Lane to Beck Road).

The anticipated scope of the improvement includes pavement reconstruction, concrete curb & gutter, sidewalk, storm sewer and other drainage improvements.  An Open House Public Meeting is anticipated to be held in Winter 2018 to display the proposed improvement and seek stakeholder input.  The Phase I Engineering Study is anticipated to conclude in Spring 2019 and the Village will then initiate Phase II Engineering, which takes 12 to 18 months and consists of detailed design and preparation of construction documentation.  The Village is pursuing federal funding to assist in paying for construction of this project, which is anticipated in 2020 at the earliest and contingent upon funding availability.

As part of the data collection stage of the project, we like to reach out to the stakeholders early in the project development process to inquire if there are any specific roadway, drainage, utility or other issues the Village should be aware of as we look at proposed improvements to Hawthorne Drive, Sprucewood Lane, and Lake Shore Drive.  If so, please fill out the below comment form which can be dropped off at Village Hall, emailed to mail@lindenhurstil.org, or mailed to the address on the back of this comment form.  You can also complete this form electronically at www.lindenhurstil.org.

* Denotes a required field
*
*
*
*
ZIP*
-
Second portion of ZIP Code is optional.
 
Telephone 
-- ext
 
*